SUMMARY
Challenge
■
To complete installation of elevators and
escalators before the opening ceremony of the
Nanjing Youth Olympic Games
■
� To ensure that all elevators and escalators on Line
S8 operated reliably to create smooth people flow
Solution
■
Manpower and material input was increased and
resource allocation was optimized to complete the
installation on schedule
■
An emergency response team was established during
the Nanjing Youth Olympic Games to provide all-round
service to ensure reliable equipment operation
FAST FACTS
Nanjing Metro Line S8
■
Completed: 2014
■
Track length: 45,216 km
■
Stations: 17 (6 underground,
11 above ground)
■
�Operator: Nanjing Metro Operation
Co., Ltd.
■
�Developer: Nanjing Metro Operation
Co., Ltd.
■
�Architect: Beijing Urban Engineering
Design & Research Institute Co., Ltd.
■
Main Contractor: China Railway
Electrification Bureau Group Co., Ltd.
KONE Solutions
■
37 KONE MonoSpace
®
elevators
■
75 KONE TransitMaster
™
140
escalators
■
KONE Care
™
Maintenance
Service