With the recent opening of Nanjing’s S8 metro line, a complex subway network now covers the entire

historic city. Spanning 45 kilometers and 17 stations and trains at a maximum speed of 120 kilometers per

hour, the line is the longest and fastest in China. Flying through the city like an orange dragon, it winds

a scenic route from Taishanxincun Station to Jinniu Lake.

Built for the 2014 Nanjing Youth Olympic Games, S8 is

the first line in Nanjing located north of the Yangtze River.

In this significant project supporting the infrastructural

and economic development of northern Nanjing, KONE

was selected as the sole supplier of the line’s 37 elevators

and 75 escalators.

No crowd too large

To ensure the project’s completion before the opening

of the Youth Olympics, the KONE team faced a time

disadvantage, with only one year to carry off the

complex task. To cope with the enormous workload,

KONE maximized manpower inputs, carried out multiple

tasks at different locations simultaneously, and managed

to deliver the equipment safely and on schedule.

On the opening day of S8, all passengers were offered a

free trip to the scenic Jinniu Lake terminal. Millions flooded

into the station, with traffic peaking at times to over

300,000 passengers. KONE assured them all a safe, smooth

and very special trip with its people flow handling capacity.

A first in China

This was the first project in China to utilize escalators

equipped with the KONE Direct Drive, a reliable and

eco-efficient escalator drive solution that has proven its

merits in many KONE infrastructure projects. The chainless

design avoids common risks such as chain breakage and

oil leakage. Replacing the chain drive with a gear drive also

consumes 20 percent less energy and requires less space

and preparation for installation, which makes it the ideal

solution for public transportation projects.

Olympic spirit

As the only metro line serving the sailing venue of the

Youth Olympics, S8 carried an extreme peak of passengers

during its first month of operation. To guarantee the

constant operation of equipment during the event, KONE

established an emergency response team of 20 experts

who remained on standby for 15 days, checking, adjusting

and maintaining equipment and communicating safety

knowledge to passengers.