SUMMARY

Challenge

To meet a tight construction schedule in a logistically

challenged site due to location and land dimensions

• To install elevators used during the construction

process and then converted into permanent ones

• To incorporate intelligent solutions that meet the

varying needs of the tenants

Solution

Providing construction time use elevators to ensure

project completion with maximum efficiency

High-speed 8 m/s elevators that include destination

control to enable the best people flow experience

FAST FACTS

Headquarters Business Park

Completed: 2014

Size: 175,000 sqm

Height: 250 m west tower;

70 m east tower

Floors: 52-story west tower;

13-story east tower

Maximum speed: 8 m/s

Building owner: Adeem Alwataniah

Developer: Al Dar Alkhasa (DK)

Architect: Battley Partners

Contractor: Freyssinet

KONE Solutions

13 KONE MiniSpace

elevators

18 KONE MonoSpace

®

elevators

2 KONE TransitlMaster

120

escalators

KONE Polaris

Destination

Control System

KONE E-Link

monitoring

system

KONE Care

Maintenance

Service

17